The Resource Draft Massachusetts contingency plan phase II comprehensive site assessment scope of work : 79 McDonald Road, Wilmington, Massachusetts, Woodard & Curran, Inc

Draft Massachusetts contingency plan phase II comprehensive site assessment scope of work : 79 McDonald Road, Wilmington, Massachusetts, Woodard & Curran, Inc

Label
Draft Massachusetts contingency plan phase II comprehensive site assessment scope of work : 79 McDonald Road, Wilmington, Massachusetts
Title
Draft Massachusetts contingency plan phase II comprehensive site assessment scope of work
Title remainder
79 McDonald Road, Wilmington, Massachusetts
Statement of responsibility
Woodard & Curran, Inc
Creator
Subject
Illustrations
maps
Literary form
non fiction
http://bibfra.me/vocab/lite/organizationName
Woodard & Curran, Inc
http://library.link/vocab/subjectName
  • Hazardous wastes
  • Hazardous substances
  • Pollution
  • McDonald Road (Wilmington, Mass.)
  • Krochmal Farm (Tewksbury, Mass.)
  • Rocco's Landfill (Tewksbury, Mass.)
  • Wilmington (Mass. : Town)
Label
Draft Massachusetts contingency plan phase II comprehensive site assessment scope of work : 79 McDonald Road, Wilmington, Massachusetts, Woodard & Curran, Inc
Instantiates
Publication
Note
  • MA DEP RTN: 3-18858
  • "In accordance with Massachusetts Contingency Plan (MCP) 310 CMR 40.0833 this scope of work describes an approach to meet Phase II Comprehensive Site Assessment (CSA) objectives. The objectives of a Phase II CSA are to fulfill the obligations of 310 CMR 40.0834 (2) including descriptions of the scope and nature of investigative and sampling programs that will be conducted to characterize the source, extent, and migration pathways of oil and/or hazardous material, and the risk of harm posed to health, safety, public welfare or the environment."
Carrier category
volume
Carrier category code
  • nc
Carrier MARC source
rdacarrier
Content category
text
Content type code
  • txt
Content type MARC source
rdacontent
Control code
810497
Dimensions
30 cm.
Edition
Draft.
Extent
13 p.
Media category
unmediated
Media MARC source
rdamedia
Media type code
  • n
Other physical details
map
System control number
(Sirsi) 810497
Label
Draft Massachusetts contingency plan phase II comprehensive site assessment scope of work : 79 McDonald Road, Wilmington, Massachusetts, Woodard & Curran, Inc
Publication
Note
  • MA DEP RTN: 3-18858
  • "In accordance with Massachusetts Contingency Plan (MCP) 310 CMR 40.0833 this scope of work describes an approach to meet Phase II Comprehensive Site Assessment (CSA) objectives. The objectives of a Phase II CSA are to fulfill the obligations of 310 CMR 40.0834 (2) including descriptions of the scope and nature of investigative and sampling programs that will be conducted to characterize the source, extent, and migration pathways of oil and/or hazardous material, and the risk of harm posed to health, safety, public welfare or the environment."
Carrier category
volume
Carrier category code
  • nc
Carrier MARC source
rdacarrier
Content category
text
Content type code
  • txt
Content type MARC source
rdacontent
Control code
810497
Dimensions
30 cm.
Edition
Draft.
Extent
13 p.
Media category
unmediated
Media MARC source
rdamedia
Media type code
  • n
Other physical details
map
System control number
(Sirsi) 810497

Library Locations

    • Wilmington Memorial LibraryBorrow it
      175 Middlesex Avenue, Wilmington, MA, 01887, US
      42.557534 -71.16399799999999
Processing Feedback ...